Title:
Marine Sensitivity Assessment for Offshore Oil and Gas Development and Production Activities in the Cronos Area, Block 6
Duration:
6 months (July 2024 – December 2024)
Funded by:
ENI and Total
Subcontracted by:
Pro Iter Ambiente S.r.l.
Project Description:
ENI announced significant gas discoveries in Block 6 Offshore of Cyprus’ Exclusive Economic Zone (EEZ), located 160 km off the Cyprus coastline at a water depth of over 2000 meters. Following Environmental Baseline and Monitoring Studies (EBS/EMS) conducted by MER and its partners, MER was contracted to undertake a comprehensive marine sensitivity assessment to support the management and mitigation strategies for offshore development activities anticipated south of Cyprus. Utilizing the Marine Evidence-based Sensitivity Assessment (MarESA) and Feature Activity Sensitivity Tool (FeAST) methodology frameworks adapted from the Marine Life Information Network’s (MarLIN) guidelines, the study predicted the adaptability and resilience of deep-sea habitats and species to external pressures induced by oil and gas offshore development and production activities in the Cronos Area.
The primary goal of this sensitivity assessment was to evaluate the ecological impacts arising from the proposed offshore activities, which included:
• the construction and operation of both gas export and Monoethylene Glycol (MEG) import lines.
This assessment strategically examined the construction, operation, and potential accidents associated with these developments. Each stage of the project was scrutinized for its specific pressures on the marine environment, such as physical disturbances from drilling and pipeline installation, chemical pollution risks from potential spills, and the biological changes induced by altered habitats. The assessment combined resistance (the feature’s ability to withstand a pressure) and resilience (the feature’s capacity to recover after pressure removal) evaluations to yield comprehensive sensitivity assessments. This approach helped delineate how critical marine features, organisms, and habitats might react to these pressures. The sensitivity assessments were supported by extensive data sourced from the EBS and EMS studies, supplemented with a broad range of secondary data gathered from scientific literature, databases, and public resources. This integration provided a detailed understanding of the baseline ecological conditions and the distribution of sensitive species and habitats within and around the project area. Special attention was given to endangered species, key biodiversity areas, and ecologically significant habitats, which were crucial in the sensitivity analysis to ensure that project interactions were managed with minimal ecological disruption.
The findings from this sensitivity assessment are instrumental in developing targeted mitigation strategies that are both effective and necessary for the sustainable management of ecological impacts associated with the offshore development activities in the Cronos Area.
The project concluded with our comprehensive proposals for monitoring and mitigation measures to reduce the risks associated with the offshore development and production activities.